8 safety maintenances of steel platform

8-safety-maintenances-of-steel-platform.

1. The steel platform shall be equipped with a load limit plate.

2. The shelving point and upper pull node of the steel platform must be located on the building, and shall not be set on the construction facilities such as scaffold, and the support system shall not be connected with the scaffold.

3. The concrete beam and slab at the shelving point of the steel platform shall be embedded and connected with the bolt of the platform.

4. The horizontal angle between the steel wire rope and the platform should be 45 to 60 degrees.

5. The tensile strength of the beam and column of the upper pull joint of the steel platform shall be checked to ensure the safety of the building and platform.

6. The snap ring shall be used for the steel platform, and the hook shall not directly hook the platform lifting ring.

7. During the installation of the steel platform, the steel wire rope shall be fastened with a special hook, and the number of clips shall not be less than 3 in other ways. The steel wire rope around the sharp corner of the building shall be lined with cushions, and the outer opening of the steel platform shall be slightly higher than the inner side.

8. The left and right sides of the steel platform must be provided with fixed railings and a dense safety net.